The result - the optimization
|
|
|
|
Energy savings and payback
For an investor or operator of a plant is the payback period is at least as important
as energy conservation and the reduction of CO2. The
payback period depends on many factors, which are based on realistic values in ISOWTC
and go beyond the requirements of VDI 2055 addition.
|
The location optimization
In all types of calculation, you have the opportunity to work with a known Thickness
your response to be expected. It is also possible Thickness calculate the required
leave. The special feature of this is that ISOWTC in this calculation because of
the layers Vendor materials themselves calculated. Here, the program also meets
even the Determining whether the predetermined diameter pipe can be insulated with
shells or a mat comes to land use. It will, of course, the Manufacturer tolerances
taken into account..
|
|
|
Optimization calculation
The newest attraction is a sophisticated calculation method, in which a Amortization
optimization and energy savings can perform optimization. In this routine, the program
calculates the optimum variation of all Variables. The main factors which have to
be taken into account:
- the insulation
- the surface condition
- Flange and valve insulation
- The Thickness
And various other factors. After this optimization will be the new, determined by
the system data compared. Now it's up to you for the new insulation layer thickness,
the new interface ... to decide. Furthermore, You will receive an evaluation tree,
which the viability of the project (Separated in energy conservation and amortization)
represents..
|
|
|
|
|